COTECCONS CONSTRUCTION JOINT STOCK COMPANY
[en from default] [text/html] : Strana
[en from default] [text/html] : Rabota na platforme GRT
9 [en from default] [text/html] : years 7 [en from default] [text/html] : months
[en from default] [text/html] : Iazyki kommunikatsii
[en from default] [text/html] : English , [en from default] [text/html] : Vietnamese
[en from default] [text/html] : Opyt raboty v stranakh
[en from default] [text/html] : Opisanie kompanii
Construction of railways and road projects: Construction and installation of civil and industrial projects, technical infrastructure of the city and industrial zones, transport works, water power works; Construction of water supply and drainage, environmental treatment.
Installation of modern construction systems.
Installation of electromechanical system.
Investment consultancy.
Production of concrete and products from cement and plaster.
Real estate trading and brokerage.
Manufacture of mining & construction machinery.
Architectural and relevant engineering consulting activities: Design of general construction site; Architectural design of civil and industrial works; Interior and exterior design; Heat, ventilation, air conditioning, civil and industrial work design; Design and construction of urban technical infrastructure.
Specializing in export, import iron, steel, construction structure, materials, other installation equipment in construction, materials – machinery – equipment – spare parts, technological line in the field of building and producing construction materials.
2004 Privatization from a construction department of Cotec Group Charter capital of VND 15,2 billion.
2005 Certified ISO 9001:2008 by QMS – Australia
2006 First charter capital increased to VND 35 billion – Stock options to shareholders at a 1:1 ratio – ESOP at value of VND 4,6 billion.
2007 Second charter capital increased to VND 59,5 billion – Stock options to shareholders at a 2:1 ratio – Stock options to shareholders at a 5:2 ratioThird charter capital increased to VND 86,5 billion – Stock options to shareholders at a 5:2 ratio – ESOP to staff at total value of VND 2,9 billionFourth charter capital increased to VND 120 billion with strategic partners.
2009 Fifth charter capital increased to VND 184,5 billion. – Stock options to shareholders at a 2:1 ratio – ESOP total value of VND 4,5 billion.
2010 Coteccons share was officially listed on HCMC Stock Exchange in accordance with Decision No. 155/QĐ – SGDHCM dated 9th December 2009. As the corner stone for their next stage in development, Coteccons opened the 1st trading day at the reference price of VND 95,000 a share on 20th Jan 2010. Sixth charter capital increased to VND 307,5 billion – Stock options to shareholders at a 3:2 ratio
2011 Seventh charter capital increased to VND 317,7 billion – ESOP at total value of VND 10,2 billion.
2012 Eighth charter capital increased to VND 422 billion: – Individual subscription to strategic shareholders at value of VND 104,3 billion.
2013 Coteccons equity in Unicons increased to 51% as a group in business.
2014 Implemented various design & build projects Masteri Thao Dien with contract value of more than VND3,316 billion was a key large-scale D&B project. This created a persuasive reason for other Investors to continuously entrust and assign Coteccons with other D&B projects such as Regina Factory – Phases 1, 2, and 3 with contract value of VND1,250 billion and First Team Factory with contract value of VND171 billion.
2015
Created favorable conditions for m&a strategy Issued totally 3,604,530 shares to swap all stocks of Unicons and increased ownership percentage rate in Unicons up to 100%.
Made a record of high growth rate The year 2015 marked a record of high growth rate in revenue and profit during the past 11 years of development, increasing by nearly 100% as compared to those in 2014. Undertook many big D&B contracts signed with new Investors, such as Gold View, T&T Vinh Hung, Duc Viet Resort, etc. Continuously signed many big contracts with value of more than VND1,000 billion such as Gold Mark City, Times City Parkhill, Vinhomes Central Park, Worldon, etc.
2016
The year 2016 continued to mark a milestone in Coteccons’ economic development. The Company’s revenue reached VND 20,783 billion, increasing by 52%. Profit increased 113% compared with that of 2015, reaching the level of VND 1,422 billion.
Coteccons surpassed many foreign contractors to win over the bid of The Landmark 81 project, the highest building in Vietnam and the 8th highest building in the world.
Many D&B projects were signed, accounting for 40% of the Company’s total revenue. Some highlights to be mentioned hereafter are Vinhomes Thang Long, Regina Manufacture Phase 5, Panorama Nha Trang, Diamond Island Phase 2, The Millenium, and D’Capitale. Coteccons performed the first private placement for strategic shareholders and raised VND 1,762 billion, increasing the Company’s charter capital by VND 770.5 billion.
In terms of technical development, Coteccons has achieved remarkable improvements by the completion of many challenging projects, including base construction packages for The Landmark 81 and The Spirit of Saigon (formerly known as The One). Moreover, the application of BIM into the transfer beam construction for the Landmark 81 project has marked initial successes.
2017
Coteccons contributed capital to set up Covestcons Co., Ltd (chartered capital of VND 1,872 Billion) for the purpose of investing in real estate, hence making the business be more diversified as well as increasing the Company’s profit.
In 2017, the Company elected the new Board of Directors and Board of Supervisors for the term of 2017-2022 and changed the management model followed the international standard model, in which the Chairman no longer cum the position of CEO of the Company.
In terms of operation, there were many the memorable milestones marked in the Company history such as winning contract of Nam Hoi An Complex Project, Vinfast Factory… and topping out the Landmark 81 Tower prior to the schedule 2 months.
[en from default] [text/html] : Adres
Ward 17, Binh Thanh Dist, Hochiminh, Dien Bien Phu No.236/6
[en from default] [text/html] : INN
[en from default] [text/html] : OGRN
[en from default] [text/html] : Telefon
84938070077
E-mail
tuanpdctc@gmail.com
[en from default] [text/html] : Pokazat' dannye
[en from default] [text/html] : Skryt' dannye