Designing of electric power facilities, automated control systems, fire safety and ventilation Designing of electric power facilities, automated control systems, fire safety and ventilation

Vendor code 2414

0.0
Rate the product

0 reviews

Price Price on demand

Description

In modern conditions of power system engineering is very important "how to start" and "timely end" construction. Specified cannot be achieved without a good project organisation which developed the design solutions to be tailored to the specifics of construction in the region, the conditions of the modes of electrical networks and is interested in reducing the time of start of input of object in operation. Usually the interest in the object from the project organization ends with the author's supervision over construction progress. Analysis of the implementation of investment programs in the electricity sector shows the urgency of addressing issues of organizational docking designers and engineers, combining their objectives and responsibilities. OOO NPP "OVIST" develops the design and engineering direction. The company's specialists are involved in "birth," the development of design solutions and are directly responsible for the start of the object. "Project commissioning" the company is fully interested in the quality and timing of design, construction and installation, commissioning work. The "erased" many of the technical disagreements that require settlement by a third party arising in construction between designers and operators, delaying the progress of work. The principle "he designed, he established" allows considering design standards, promptly address, and implement technical problem at the facility.